Feasibility and advisory, through design and construction, into operation, liability and the grid, for solar, wind, storage and hybrid generation.
Cover we arrange
Feasibility and advisory
Professional indemnity for the resource, yield, connection and cost studies a final investment decision is taken on, where the exposure is the number in the model rather than anything physical.
Design and construction
Contract works and erection all risks, delay in start up, marine and inland transit for imported plant, and the testing and commissioning window where most of the loss sits.
Operational property and machinery
Hail, wind, fire and flood on the asset, plus machinery breakdown and the business interruption that follows an outage.
Offtake and PPA business interruption
Where an outage leaves you short of a contracted volume, the loss is not only lost generation revenue: it is the cost of buying replacement energy at spot to meet the PPA. Both sides of that need to be measured and insured, and a financial or virtual PPA behaves differently again.
Liability, and the grid connection
Public and products liability, and liability for damage behind the connection point. We read the connection agreement before placing, so cover is built to the obligations actually signed.
Lender and investor requirements
Cover written to the financing documents, with the certificates the financier needs when they need them.